Scope of the project includes; Modelling of the grids (TAP) with DigSilent; Demand & generation forecasting (adequacy); Load flow and n-1 contingency analysis; Reliable power transmission limit calculations (NTC calculations); Transient stability analysis; Recommendations for the phases of the project
Regional Demand Projection based on Econometric & S-Curve Techniques
- Client: ÇAEHAŞ
- Country: Türkiye
- Year: Nov, 2024