Scope of the project includes; Modelling of the grids (TAP) with DigSilent; Demand & generation forecasting (adequacy); Load flow and n-1 contingency analysis; Reliable power transmission limit calculations (NTC calculations); Transient stability analysis; Recommendations for the phases of the project
Azerbaijan Energy Transition – Phase II

- Client: AzerEnerji
- Country: Azerbaijan
- Year: Feb, 2025