Objective of the study is to verify that the equipment in the plant substation and its connection with the grid is appropriate in terms of over-voltage caused by switching and lightning surges.
Grid Code Compliance Analyses of 40 MW Lachendorf PV Solar Power Plant – Germany

- Client: INTEC Energy Solutions
- Country: Germany
- Year: Oct, 2025


