digsilent

Feasibility of 250 MW Battery Energy Storage System (BESS) in Azerbaijan Grid

The study will address technical requirements from the BESS to support secure and reliable integration of renewables to Azerbaijan grid. Optimum location, size, and EMS controller requirements will also be addressed in the study.

Relevant Projects

LVRT & Frequency Control Analysis of 230 MW Garadagh – Solar Power Plant
Grid Code Compliance Analysis 240 MW Khizi – Absheron Wind Power Project
Azerbaijan Energy Transition – Phase II