digsilent

Çan-2 Thermal Power Plant PSS Parameters Theoretical Analysis and Parameter Optimization Study

Scope of the project includes:

  • Development of a Quesitonnaire, Data Collection, and Modelling
  • Data freeze (assumptions for missing data)
  • Modeling of AVR and PSS of the unit and PSS parameter optimization

Relevant Projects

Regional Demand Projection based on Econometric & S-Curve Techniques
Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye