Scope of the project includes 1) Data collection & grid modelling (DigSilent PowerFactory); 2) Static model (target year 2025); 3) Dynamic model (target year 2025); 4) Data freeze (assumptions for unavailable data); 5) Grid analyses (a. Static analyses (Load flow, short circuit)), b. Dynamic analyses (Transient stability, voltage stability); 6) CO2 emission analyses (diesel generator vs HPP); 7) Smart grid requirement analyses (SPS, SVC, FACTs, etc.) based on the results of grid analyses.
Comparison of Supercapacitor & Li-Ion Storage Technologies in Turkish Electricity Market
- Client: Supracap
- Country: Türkiye
- Year: Nov, 2024