digsilent

10 Years Master Plan Project of Turkmenistan Power Grid

Scope of the project includes; Network modelling with DigSilent PowerFactory software; Long-term regional demand forecasting; Determination of weak points in the grid by network simulation studies; Investment requirements and prioritization; Procurement of DigSilent PowerFactory licenses; Trainings on the use of the simulation software to ensure Turkmenenergo enegineers’ ability to develop future network development plans.

Relevant Projects