News from EPRA
New Project: Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye
Wind is blowing stronger for EPRA Energy this year!
Enerjisa Üretim preferred the quality of EPRA Energy for the grid connection and grid code compliance analysis of 4 important projects:
- ARTURNA-2 Wind Power Plant (WPP)
- FALP WPP
- GAIA WPP
- FALP WPP
Happy to support the secure, reliable, stable, and sustainable connections of renewables to power systems worldwide.
New Project: Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
Gazipaşa Enerji Üretim A.Ş. preferred quality of EPRA Energy for Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant. The study will analyse transformation of the existing Birkapılı Hydraulic Power Plant to a Hybrid Power Plant with wind turbines.
We participated in Wind Energy Hamburg
We participated in the world’s largest wind industry fair, WindEnergy Hamburg, with the Turkish delegation organized by the Turkish Wind Energy Association Türkiye Rüzgar Enerjisi Birliği (TÜREB).
New Project: Frequency Stability Assessment System of Litgrid – Consulting and Programming Support
We are thrilled to announce that EPRA Energy is qualified by Litgrid for Consulting and Programming Support for the Frequency Stability Assessment System (FSAS) of Litgrid.
Happy to support the security, reliability, stability, and sustainability of power systems worldwide.
New Project: Grid Studies of a Utility Scale PV Solar Power Plant in Mauritius
Did you know dodo (Raphus cucullatus) is an extinct flightless bird that was endemic to the island of Mauritius, which is east of Madagascar in the Indian Ocean.
We did not either until we are qualified by INTEC Energy Solutions for Grid Studies in Mauritius.
The study will address impacts of a utility scale PV Solar Power Plant (SPP) on the Mauritius Power Grid to ensure secure, reliable, and affordable integration of the PV SPP to the grid.
By adding value to data with advanced modeling and analysis techniques, we are happy to support the transformation of power systems in a secure, reliable, sustainable and economical way worldwide.
YEDAS DisCo preffered EPRA for GIS Model –> DigSilent PowerFactory Integration
YEDAŞ – Yeşilırmak Elektrik Dağıtım A.Ş. (DisCo) preffered solutions of EPRA Energy for integrating its Geographic Information System (GIS) Model with its power system simulation software DIgSILENT PowerFactory. Python based algorithms developed by EPRA Energy enables YEDAS DisCo automatic reporting of errors in the GIS model (if any) and automatic transformation of the GIS model to hashtag#DIgSILENT hashtag#PowerFactory model, in busbar, switchgear, and feeder details, ready for grid analysis.
New Project: Grid Analyses of 113 MW Goktepe Wind Power Plant in Türkiye
We continue supporting secure and reliable connections of renewables to grids worldwide.
EPRA Energy is qualified by Polat Enerji for “Grid Analyses of 113 MW Goktepe Wind Power Plant in Türkiye.”
Quasi-dynamic simulations will be performed to assess secure and reliable capacity extension potential of the plant.
New Project: Bazian Power Plant – Protection Coordination of Substation Auxiliary System
Proud to announce that we are qualified by TAURUS ENERGY to perform protection coordination analyses of the substation auxiliary system of Bazian Power Plant.
New Project: AVR & PSS Tuning & Tests of ÇAN-2 TPP
Excited to announce that we are qualified by ODAŞ for “Parameter tuning & tests of Automatic Voltage Regulator (AVR) & Power System Stabilizer (PSS) of Çan 2 Thermal Power Plant (TPP).
We will collaborate with JT Systems Power Engineering (Mr. José Taborda) in the project as usual.
Proper tuning of parameter settings of the AVR & PSS of the plant will ensure positive damping (or at least prevent negative damping ) to both local (~1Hz) and inter-area (~0,15Hz) oscillations to contribute improving stability of the Turkish power grid.
New Project: UEDAŞ DisCo – Grid Master Plan & Master Project (2025 – 2035)
We are excited to announce our new project: UEDAŞ DisCo – Grid Master Plan & Master Project (2025 – 2035). Scope of the project includes:
- Data collection for modelling
- Demand projection
- Planning criteria
- Modelling of the grid with DIgSILENT PowerFactory
- Grid analysis
- Prioritization of the grid investment requirements
- CAPEX reports
Projects
EPRA has carried out more than 100 projects that involve R&D and high engineering services for numerous public and private sector institutions and organizations in Turkey and more than 10 countries with its advanced analytical competencies and technical skills covering a wide range of areas from analysis of short-term system dynamics to long-term market simulations in the electricity energy sector.
Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye
- Client: EnerjiSA Üretim
- Country: Türkiye
- Year: Sep, 2024
Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
- Client: Gazipaşa Enerji Üretim A.Ş.
- Country: Türkiye
- Year: Oct, 2024
Frequency Stability Assessment System of Litgrid – Consulting and Programming Support
- Client: Litgrid
- Country: Lithuania
- Year: Sep, 2024
Grid Studies of a Utility Scale PV Solar Power Plant in Mauritius
- Client: INTEC Energy Solutions
- Country: Mauritius
- Year: Sep, 2024
YEDAS DisCo GIS Model –> DigSilent PowerFactory Integration Update
- Client: YEDAS DisCo
- Country: Türkiye
- Year: Sep, 2024
Grid Analyses of 113 MW Goktepe Wind Power Plant in Türkiye
- Client: Polat Enerji
- Country: Türkiye
- Year: Sep, 2024
Bazian Power Plant – Protection Coordination of Substation Auxiliary System
- Client: TAURUS ENERGY
- Country: Irak
- Year: Sep, 2024
UEDAŞ DisCo – Grid Master Plan & Master Project (2025 – 2035)
- Client: MERAM DisCo
- Country: Türkiye
- Year: Aug, 2024
Impact of Locational Marginal Pricing (LMP) on Türkiye’s Power System: Accelerating Renewable Energy Integration
- Client: SHURAEnergy Transition Center
- Country: Türkiye
- Year: Aug, 2024